Maine wind farms
Maine has 27 wind projects with 466 turbines and 1.2 GW of capacity, ranking #23 among US states and territories for installed wind. The largest is Bingham Wind in Somerset County at 185 MW.
- Wind projects
- 27
- Turbines
- 466
- Capacity
- 1.2 GW
- National rank
- #23
Map of Maine wind projects
Top counties for wind
Counties with existing wind farms already have the roads, permits and grid connections that developers look for.
| County | Capacity | Turbines |
|---|---|---|
| Somerset County | 244 MW | 72 |
| Washington County | 209 MW | 87 |
| Aroostook County | 190 MW | 77 |
| Franklin County | 166 MW | 56 |
| Hancock County | 158 MW | 58 |
| Penobscot County | 132 MW | 63 |
| Oxford County | 109 MW | 47 |
| Knox County | 5 MW | 3 |
| Waldo County | 5 MW | 3 |
Thinking about a wind lease in Maine?
The most recent project in the database, Downeast Wind, came online in 2025. If a developer has approached you, compare their offer against what you can learn about your own wind and the projects around you.
Rules on setbacks, decommissioning and how turbines are taxed differ between states and counties. Ask an independent Maine attorney who has reviewed wind agreements, and check with your county about local wind ordinances.
All Maine wind projects
| Project | County | Capacity | Turbines | Hub height | Online |
|---|---|---|---|---|---|
| Bingham Wind | Somerset County | 185 MW | 56 | 94 m | 2016 |
| Oakfield Wind | Aroostook County | 148 MW | 48 | 84 m | 2015 |
| Downeast Wind | Washington County | 126 MW | 30 | 120 m | 2025 |
| Weaver | Hancock County | 73 MW | 22 | 117 m | 2020 |
| Kibby Mountain, phase I | Franklin County | 66 MW | 22 | 80 m | 2009 |
| Kibby Mountain II | Franklin County | 66 MW | 22 | 80 m | 2010 |
| Rollins | Penobscot County | 60 MW | 40 | 80 m | 2011 |
| Moscow Wind | Somerset County | 59 MW | 14 | 105 m | 2025 |
| Stetson | Washington County | 57 MW | 38 | 80 m | 2009 |
| Hancock | Hancock County | 51 MW | 17 | 117 m | 2016 |
| Record Hill | Oxford County | 51 MW | 22 | 80 m | 2011 |
| Passadumkeag | Penobscot County | 43 MW | 13 | 84 m | 2016 |
| Mars Hill | Aroostook County | 42 MW | 28 | 80 m | 2006–2007 |
| Bull Hill | Hancock County | 34 MW | 19 | 95 m | 2012 |
| Saddleback Ridge | Franklin County | 34 MW | 12 | 85 m | 2014–2015 |
Source: U.S. Wind Turbine Database from the U.S. Geological Survey, Lawrence Berkeley National Laboratory and the American Clean Power Association, retrieved 2026-11-19. Includes land-based and offshore turbines that are built or under construction. Projects built in phases are combined; dots show the average location of each project's turbines.